Printer-friendly version Add This

ETC Meeting Minutes 06/12/2012

Attendance

NameOrganization
Katie BaynesECHO
Doug NewmanECHO
Jon VelapoldiECHO
Andy MitchellECHO
Chris FinchJPL
Merlee HansenSEDAC
Ed SeilerGES DISC
Frank SchafferNSIDC
Cathy FowlerNSIDC
Bill HorstNSIDC
Chris BondNSIDC
Peter GibbonsNSIDC
Lisa BookerNSIDC
Matt MartensLPDAAC
Travis KrohLPDAAC
Dawn SiemonsmaLPDAAC
Ben McMurryORNL
Lindsay ParkerASDC
Marsha LaroseeASDC

 

ECHO System Status & PM Planning

  • Ingest Pauses have dropped dramatically over past two weeks following backported fixes
  • Performance issues continue to be investigated, possible contributing factor: internal network scans, fix in progress
  • Still working in move towards a consolidated support tool over the next month or so, used by other Earthdata teams
  • Reverb moving to reverb.earthdata.nasa.gov in the upcoming weeks
  • Power tests/migrations went smoothly, no outages
  • Partner Test:  Saturday 6/2 unplanned kernel outage, Monday 6/4 unplanned ingest outage
  • Operations: Friday 6/8 unplanned outage in operations, elastic performance degradation, required system reboot

 

Recent Reverb Metrics

[[{"type":"media","view_mode":"media_original","fid":"3457","attributes":{"class":"media-image","height":"309","id":"4","style":"width: 500px; height: 309px; ;;;;;;","typeof":"foaf:Image","width":"500"}}]]

Recent Performance Metrics

[[{"type":"media","view_mode":"media_original","fid":"3458","attributes":{"class":"media-image","height":"271","id":"4","style":"width: 500px; height: 271px; ;;;;;;","typeof":"foaf:Image","width":"500"}}]]

 

In Operations 10.47 

  • Pushed to Operations 6/6
  • NCR 11010708 Ordering multiple products from the same input granule, in test now, check your provider policy in PUMP, working with Abdul Khan on ECS side (status from Matt or Abdul on this?)
  • Orbital searching algorithm fixes
  • NCR 11012095 Large Granule Orders Slow
  • NCR 11011946 Adjustability on Granule Results page (backported from 10.48)
  • Backported special characters ingest work

 

In Test 10.48

  • Pushing to Partner Test 6/13
  • Much has been backported
  • NCR 11012417 ECHO Reverb (10.44.10): Interface hanging indefinitely with "Failed to complete current request" growler
  • NCR 11012455 Improved URS/Account Informational Text
  • Red Growl Error Messages from some Reverb searches

 

10.48 will be deployed to Operations next Wednesday 6/20

 

In Work 10.49

  • 2 week sprint, finishing up this week
  • NCR 11012448 Reverb granule results page "show metadata" link shows white-on-white (invisible) text (Duplicate 11012398)
  • NCR 11012227 ECHO Reverb: Link NSIDC test-WMS to ECHO test environments
  • Additional NCRs related to Reverb errors (11012510, 11012511, 11012512, 11012513, 11012514)
  • NCR 11012411 more URS informational text

 

New ETC Topic: Reverb-beta Retirement

  • We will be retiring the reverb-beta environment starting this afternoon
  • As need arises, it may be brought back for prototyping and feedback requests

 

Upcoming Events

  • Operations URS updates - 6/13/2012
  • Partner Test 10.48 Update - 6/13/2012
  • Testbed 10.49 Update -  6/20/2012
  • Operations 10.48 + security fix  - 6/20/2012

 

Open Floor